It is the first small LNG receiving station in China that adopts independent technologies and China equipment.
The annual turnover of the project is 3 million m3 (about 1.32 million tons) .
The total capacity of the LNG storage tanks is 200,000 m3
This project is located in Chengmai County, Hainan Province. Xindi independently accomplished the whole process of engineering design, procurement, construction, commissioning, and start-up. The project has been put into operation in 2014. The LNG reserve station system recovers BOG gas through normal temperature compressors, which reduces cost and equipment procurement period. It fills the gap using normal temperature compressor in the market and has gained two patent certificates.