CNPC LNG reserve station and dock project in Hainan

It is the first small LNG receiving station in China that adopts independent technologies and China equipment.

The annual turnover of the project is 3 million m3 (about 1.32 million tons) .

The total capacity of the LNG storage tanks is 200,000 m3


This project is located in Chengmai County, Hainan Province. Xindi independently accomplished the whole process of engineering design, procurement, construction, commissioning, and start-up. The project has been put into operation in 2014. The LNG reserve station system recovers BOG gas through normal temperature compressors, which reduces cost and equipment procurement period. It fills the gap using normal temperature compressor in the market and has gained two patent certificates.




CNPC LNG reserve station and dock project in Hainan




CNPC LNG reserve station and dock project in Hainan




CNPC LNG reserve station and dock project in Hainan




CNPC LNG reserve station and dock project in Hainan




  • An Integrated Service Provider for Energy Clean Utilization
  • Human orientation, pursuit of excellence and harmonious coexistence
  • Innovate green energy engineering, Improve the quality of human life
About Us
Profile Culture Organization Responsibility
Technology Innovation
Natural Gas Purification Natural Gas Cryogenic Liquefaction Natural Gas Utilization Design Coal-Based Clean Energy Utilization LNG Receiving Terminal Energy-Saving & Environment Protection Equipment Integration Technology
Capacity & References
Qualifications Capacity Typical Cases Project List
Contact Us
Xindi Energy Engineering Technology Co., Ltd.
Block B, South District, Technology Park, No.118 Huaxiang Road, Langfang Development Zone, Langfang, Hebei Province
Fax:+86-316-2591234

Xindi Energy Engineering