Annual COG treatment capacity: 320 Million Nm3
Annual LNG capacity: 173 Million Nm3
High purity hydrogen extraction 16 Million Nm3/a
The project is located at Luanxian County Industrial Zone, Hebei Province. It uses advanced technologies independently developed by Xindi, such as COG purification, methane synthesis, mixed refrigeration liquefaction, low temperature fractionation, and carbon addition to improve methane production and PSA to extract hydrogen.
The project was successfully put into use in August 2014.
Thangshan Tangsteel COG to LNG Project
Xindi Energy Engineering