Home >  Capacity & References >  Typical Cases >  Coal-Based Clean Energy Utilization

Henan Jingbao COG to LNG Project

Annual COG treatment capacity: 240 Million Nm3

Annual LNG capacity: 95 Million Nm3


The project is located at Pingdingshan City, Henan Province. Xindi provides complete process package, design and installation service, as well as the independently developed COG purification, methane synthesis, liquefaction separation process, etc. Producing LNG by using the COG produced during the production process not only improves the comprehensive utilization of COG, but also effectively reduces the customer’s investment and operating cost.


The project was successfully put into production in May 2013 and has been working smoothly since then. It has achieved the design LNG capacity of 300,000m3/day and has become the model project for its long term, full load and safe operation.



Henan Jingbao COG to LNG Project



Henan Jingbao COG to LNG Project



Henan Jingbao COG to LNG Project


  • An Integrated Service Provider for Energy Clean Utilization
  • Human orientation, pursuit of excellence and harmonious coexistence
  • Innovate green energy engineering, Improve the quality of human life
About Us
Profile Culture Organization Responsibility
Technology Innovation
Natural Gas Purification Natural Gas Cryogenic Liquefaction Natural Gas Utilization Design Coal-Based Clean Energy Utilization LNG Receiving Terminal Energy-Saving & Environment Protection Equipment Integration Technology
Capacity & References
Qualifications Capacity Typical Cases Project List
Contact Us
Xindi Energy Engineering Technology Co., Ltd.
Block B, South District, Technology Park, No.118 Huaxiang Road, Langfang Development Zone, Langfang, Hebei Province
Fax:+86-316-2591234

Xindi Energy Engineering